GTM head GTM body

Support

FAQ

FAQ

A
The general lead time is calculated starting from the sample approval date. For processed bar materials, the lead time is 60–90 days after formal mass production begins. For casting or forging products, the lead time is 60–90 days, excluding the mold development period.

A
Yes, we specialize in OEM/ODM services. Our engineering team works closely with clients from the initial design phase to final production to ensure all specifications are met.

A
We are ISO 9001 certified. We also utilize advanced inspection equipment such as CMM, profile projectors, and roughness testers to maintain strict quality control.